Consumer Goods

2024

Module plant

Assembly line for compressor modules

Seventeen stations from bare frame to leak-tested module, each one scanning, torquing and logging what it did.

Client

Corvid Climate Systems

Duration

26 weeks

Scope

Turnkey line · Traceability · Testing

Row of white automated assembly stations with yellow guard rails and cable chains

86 s

takt time

17

stations, every one traced

98.9%

first-pass yield

The challenge

A new product, a fixed launch date and an assembly process that existed only as a drawing.

What we built

A turnkey line with manual, semi-automatic and automatic stations, a pallet transfer system and an end-of-line leak and function test.

  • Every screw torqued and logged against the serial number
  • Poka-yoke on each manual station
  • Test data streamed to the quality dashboard

Results

Launch on the agreed date, 86-second takt from week four and a first-pass yield that keeps climbing.

Project data

Client

Corvid Climate Systems

Sector

Consumer Goods

Location

Module plant

Year

2024

Duration

26 weeks

Next step

Planning something similar?

Send us a short description and a few photos of the line. A controls engineer will call you back.

Create a free website with Framer, the website builder loved by startups, designers and agencies.