Consumer Goods

2026

Riverton plant

Panel forming line, rebuilt in eleven days

A 1990s relay-logic forming line moved to modern PLCs, remote I/O and a plant-wide SCADA view without losing a single production week.

Client

Halvorsen Home Appliances

Duration

11-day shutdown

Scope

Retrofit · PLC · Safety · SCADA

Long automated forming line with white machine frames and yellow cable trays in a bright factory hall

+23 pts

OEE, 61% to 84%

11 days

planned shutdown

−38%

scrap rate

The challenge

The side-panel line ran on relay logic nobody on site had drawn in twenty years. Every stop meant hours of fault-finding, and spare parts came from scrapyards.

What we built

We traced and redrew the whole machine, then replaced it in stages: new PLC and remote I/O, a safety controller with zone-based stops and a SCADA overview the shift lead actually reads.

  • Full simulation of the new logic against the old cycle before the shutdown
  • Pre-wired cabinets tested in our hall, swapped over two weekends
  • Alarm texts written with the operators, not for them

Results

The line restarted on day eleven and reached its old output in three shifts. Twelve months later OEE sits at 84% and unplanned stops are down by two thirds.

Project data

Client

Halvorsen Home Appliances

Sector

Consumer Goods

Location

Riverton plant

Year

2026

Duration

11-day shutdown

Next step

Planning something similar?

Send us a short description and a few photos of the line. A controls engineer will call you back.

Create a free website with Framer, the website builder loved by startups, designers and agencies.