Taktwerk

← All projects

Food & Beverage

2025

Bottling hall

Filling and capping line for a regional dairy

Filler, capper, labeller and case packer from four vendors, tied into one line controller with a single changeover button.

Client

Alder Creek Dairy

Duration

20 weeks

Scope

Line integration · Hygienic design · MES

White bottles moving on a blue conveyor under a stainless steel filling funnel

24,000

bottles per hour

−62%

changeover time

99.7%

fill accuracy

The challenge

Four good machines that did not talk to each other. Every format change meant four operators at four panels and forty minutes of lost output.

What we built

A line controller that owns the recipe and pushes it to every machine, with accumulation tables tuned so one short stop no longer stops the line.

  • Washdown-rated cabinets and stainless cable routes
  • Line speed balanced around the filler as the bottleneck
  • Batch records sent straight to the dairy's MES

Results

Changeovers dropped from forty minutes to fifteen, and the line now runs at its nameplate speed on every format.

Project data

Client

Alder Creek Dairy

Sector

Food & Beverage

Location

Bottling hall

Year

2025

Duration

20 weeks

Next step

Planning something similar?

Send us a short description and a few photos of the line. A controls engineer will call you back.

Create a free website with Framer, the website builder loved by startups, designers and agencies.