Taktwerk

System integrator · lines · cells · plant software

Automation that keeps the line moving.

We design, build and commission automated production lines, robotic cells and plant software, then stay on call for the next fifteen years.

Lines commissioned

240+

Availability after handover

98.6%

Service desk response

< 2 h

Line 04 · Compressor modules · live view

Running

Shift B · takt 86 s

ST-01

Infeed

Cycle

2.1 s

ST-02

Robot loading

Cycle

12.4 s

ST-03

Vision check

Cycle

0.8 s

ST-04

Torque & fit

Cycle

9.6 s

ST-05

Leak test & pack

Cycle

11.2 s

OEE

87.4%

OEE

87.4%

Cycle time

12.6 s

Units / hour

1,284

First-pass yield

98.9%

  • PLC & safety programming

  • Robotic cells

  • Machine vision

  • SCADA & MES

  • Machine retrofit

  • Panel building

  • Factory acceptance tests

  • On-site commissioning

  • 24/7 remote support

02 / Method

Five stages. One accountable team.

Every project follows the same route, with a signed gate at the end of each stage. You always know what is finished, what comes next and who owns it.

01

Audit & specification

We map losses on your floor and write a functional specification you can sign.

2–4 weeks

02

Design & simulation

Mechanical, electrical and software design, proven in a digital twin before steel is cut.

4–8 weeks

03

Build & FAT

Cabinets, stations and code built and tested in our hall with your operators present.

6–12 weeks

04

Install & commission

Installation, site acceptance and ramp-up, planned around your production calendar.

1–4 weeks

05

Support & optimise

Service desk, spare-part plan and quarterly OEE reviews for the life of the line.

Ongoing

03 / In numbers

Numbers we are willing to sign.

Measured at handover and twelve months later, written into the contract, reviewed with you every quarter.

240+

lines and cells commissioned since 2004

98.6%

average availability twelve months after handover

< 2 h

first response from the service desk, day or night

14 mo

median payback on robotic cell projects

06 / Field reports

What plant managers tell their boards.

“They simulated the whole changeover before touching the line. We restarted on day eleven, exactly as planned.”

IS

Ingrid Solberg

Plant Manager, Halvorsen Home Appliances

“The robot cell paid for itself in fourteen months, and the night shift finally stopped calling me.”

RM

Rafael Montoya

Operations Director, Veltra Mobility

“Four machines from four vendors now behave like one line. Changeovers went from forty minutes to fifteen.”

HB

Hannah Brooks

Head of Engineering, Alder Creek Dairy

07 / Questions

What we get asked at the first meeting.

Something else on your mind? A controls engineer, not a sales rep, answers within one working day.

How long does a typical project take?

Do you work with the PLC and robot brands we already use?

Can you install without stopping production?

Who owns the source code?

What happens after handover?

08 / Next step

Your line, running better within one quarter.

A two-day audit on your floor: loss map, three ranked options and honest budget figures. No obligation to build with us.

Create a free website with Framer, the website builder loved by startups, designers and agencies.